Rich County, Utah — Interconnection Projects

The interXdata warehouse tracks 11 interconnection projects in Rich, Utah, representing 1,131 MW of requested capacity.

11Total projects
0Active
1Operational
10Withdrawn
1,131 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Wind4713 MW
Solar+Battery6360 MW
Solar158 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
West Queue Project 300 — Wind in Rich, Utah300Wind362.0 MWwithdrawnRich, Utah
West Queue Project 80 — Wind in Rich, Utah80Wind240.0 MWwithdrawnRich, Utah
West Queue Project 868 — Wind in Rich, Utah868Wind80.0 MWwithdrawnRich, Utah
West Queue Project 1083 — Solar+Battery in Rich, Utah1083Solar+Battery80.0 MWwithdrawnRich, Utah
West Queue Project TCS-22 — Solar+Battery in Rich, UtahTCS-22Solar+Battery80.0 MWwithdrawnRich, Utah
West Queue Project 1094 — Solar+Battery in Rich, Utah1094Solar+Battery80.0 MWwithdrawnRich, Utah
West Queue Project TCS-17 — Solar+Battery in Rich, UtahTCS-17Solar+Battery80.0 MWwithdrawnRich, Utah
Sage Solar I-III62399_77778Solar57.6 MWoperationalRich, Utah
West Queue Project 1046 — Wind in Rich, Utah1046Wind31.1 MWwithdrawnRich, Utah
PACE Queue Project C4-006 — Solar+Battery in Rich, UtahC4-006Solar+Battery20.0 MWwithdrawnRich, Utah
PACE Queue Project C4-007 — Solar+Battery in Rich, UtahC4-007Solar+Battery20.0 MWwithdrawnRich, Utah

Top developers

Developer (canonical)ProjectsCapacity
Iberdrola Renewables, Inc.1240 MW

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Rich County.

Start tracking with interXdata