West Queue Project 823 — Solar in Emery, Utah

West Queue Project 823 — Solar in Emery, Utah is a 178.0 MW solar interconnection project in Emery, Utah with a current status of active. It is proposed to connect at Emery substation.

178.0 MWCapacity
ActiveStatus
WestMarket
SolarTechnology

Project facts

Canonical nameWest Queue Project 823 — Solar in Emery, Utah
Queue ID823
Statusactive
Source statusactive
MarketWest
TechnologySolar
Capacity178.0 MW
StateUtah
CountyEmery
Point of interconnectionEmery substation
Requested (queue) date2016-11-15
Proposed in-service date2027-02-01
Operational date
Withdrawn date
DeveloperPacifiCorp
Utility / transmission ownerPacifiCorp

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata