West Queue Project GI-0109 — Gas in Clay, Minnesota

West Queue Project GI-0109 — Gas in Clay, Minnesota is a 50.0 MW gas interconnection project in Clay, Minnesota with a current status of withdrawn. It is proposed to connect at Moorhead.

50.0 MWCapacity
WithdrawnStatus
WestMarket
GasTechnology

Project facts

Canonical nameWest Queue Project GI-0109 — Gas in Clay, Minnesota
Queue IDGI-0109
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologyGas
Capacity50.0 MW
StateMinnesota
CountyClay
Point of interconnectionMoorhead
Requested (queue) date2001-08-20
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerWAPA/BEPC/HCPD Integrated System

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata