West Queue Project GI-0517 — Coal in Campbell, South Dakota

West Queue Project GI-0517 — Coal in Campbell, South Dakota is a 700.0 MW coal interconnection project in Campbell, South Dakota with a current status of withdrawn. It is proposed to connect at Leland Olds-Ft Thompson 345kV.

700.0 MWCapacity
WithdrawnStatus
WestMarket
CoalTechnology

Project facts

Canonical nameWest Queue Project GI-0517 — Coal in Campbell, South Dakota
Queue IDGI-0517
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologyCoal
Capacity700.0 MW
StateSouth Dakota
CountyCampbell
Point of interconnectionLeland Olds-Ft Thompson 345kV
Requested (queue) date2005-12-08
Proposed in-service date2014-04-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerWAPA/BEPC/HCPD Integrated System

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.