West Queue Project GI-0825 — Diesel in Clay, Minnesota
West Queue Project GI-0825 — Diesel in Clay, Minnesota is a 11.0 MW diesel interconnection project in Clay, Minnesota with a current status of operational. It is proposed to connect at Moorhead 115kV [Centennial 115kV.
11.0 MWCapacity
OperationalStatus
WestMarket
DieselTechnology
Project facts
| Canonical name | West Queue Project GI-0825 — Diesel in Clay, Minnesota |
|---|---|
| Queue ID | GI-0825 |
| Status | operational |
| Source status | operational |
| Market | West |
| Technology | Diesel |
| Capacity | 11.0 MW |
| State | Minnesota |
| County | Clay |
| Point of interconnection | Moorhead 115kV [Centennial 115kV |
| Requested (queue) date | 2008-12-17 |
| Proposed in-service date | 2010-05-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | City of Moorhead, MN |
| Utility / transmission owner | WAPA/BEPC/HCPD Integrated System |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata