West Queue Project GI-0906 — Wind in Todd, South Dakota

West Queue Project GI-0906 — Wind in Todd, South Dakota is a 90.0 MW wind interconnection project in Todd, South Dakota with a current status of withdrawn. It is proposed to connect at Mission 115kV.

90.0 MWCapacity
WithdrawnStatus
WestMarket
WindTechnology

Project facts

Canonical nameWest Queue Project GI-0906 — Wind in Todd, South Dakota
Queue IDGI-0906
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologyWind
Capacity90.0 MW
StateSouth Dakota
CountyTodd
Point of interconnectionMission 115kV
Requested (queue) date2009-02-09
Proposed in-service date2015-11-15
Operational date
Withdrawn date
DeveloperCitizens Enterprises Corporation
Utility / transmission ownerWAPA/BEPC/HCPD Integrated System

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.