West Queue Project GI-0922 — Wind in Tripp, South Dakota
West Queue Project GI-0922 — Wind in Tripp, South Dakota is a 210.0 MW wind interconnection project in Tripp, South Dakota with a current status of withdrawn. It is proposed to connect at Witten 115kV.
210.0 MWCapacity
WithdrawnStatus
WestMarket
WindTechnology
Project facts
| Canonical name | West Queue Project GI-0922 — Wind in Tripp, South Dakota |
|---|---|
| Queue ID | GI-0922 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | West |
| Technology | Wind |
| Capacity | 210.0 MW |
| State | South Dakota |
| County | Tripp |
| Point of interconnection | Witten 115kV |
| Requested (queue) date | 2009-07-29 |
| Proposed in-service date | 2011-03-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | WAPA/BEPC/HCPD Integrated System |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.