West Queue Project GI-1001 — Wind in Campbell, South Dakota

West Queue Project GI-1001 — Wind in Campbell, South Dakota is a 99.0 MW wind interconnection project in Campbell, South Dakota with a current status of operational. It is proposed to connect at Bismarck-Glenham 230kV.

99.0 MWCapacity
OperationalStatus
WestMarket
WindTechnology

Project facts

Canonical nameWest Queue Project GI-1001 — Wind in Campbell, South Dakota
Queue IDGI-1001
Statusoperational
Source statusoperational
MarketWest
TechnologyWind
Capacity99.0 MW
StateSouth Dakota
CountyCampbell
Point of interconnectionBismarck-Glenham 230kV
Requested (queue) date2010-01-13
Proposed in-service date2015-11-15
Operational date
Withdrawn date
DeveloperCampbell Cty Wind
Utility / transmission ownerWAPA/BEPC/HCPD Integrated System

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.