West Queue Project GI-1401 — Wind in Butte, South Dakota

West Queue Project GI-1401 — Wind in Butte, South Dakota is a 103.0 MW wind interconnection project in Butte, South Dakota with a current status of active. It is proposed to connect at Newell-Maurine 115kV.

103.0 MWCapacity
ActiveStatus
WestMarket
WindTechnology

Project facts

Canonical nameWest Queue Project GI-1401 — Wind in Butte, South Dakota
Queue IDGI-1401
Statusactive
Source statusactive
MarketWest
TechnologyWind
Capacity103.0 MW
StateSouth Dakota
CountyButte
Point of interconnectionNewell-Maurine 115kV
Requested (queue) date2014-01-06
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerWAPA/BEPC/HCPD Integrated System

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.