West Queue Project GI-2022-153 — Battery in Riverside, California
West Queue Project GI-2022-153 — Battery in Riverside, California is a 100.0 MW battery interconnection project in Riverside, California with a current status of active. It is proposed to connect at Ave 42 Substation.
100.0 MWCapacity
ActiveStatus
WestMarket
BatteryTechnology
Project facts
| Canonical name | West Queue Project GI-2022-153 — Battery in Riverside, California |
|---|---|
| Queue ID | GI-2022-153 |
| Status | active |
| Source status | active |
| Market | West |
| Technology | Battery |
| Capacity | 100.0 MW |
| State | California |
| County | Riverside |
| Point of interconnection | Ave 42 Substation |
| Requested (queue) date | 2022-01-28 |
| Proposed in-service date | 2024-03-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Imperial Irrigation District |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata