West of Pecos Solar (14INR0044)

West of Pecos Solar is a 100.0 MW solar interconnection project in Reeves, Texas with a current status of operational. It is proposed to connect at 11083 Riverton 138kV.

100.0 MWCapacity
OperationalStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameWest of Pecos Solar
Queue ID14INR0044
Statusoperational
Source statusoperational
MarketERCOT
TechnologySolar
Capacity100.0 MW
StateTexas
CountyReeves
Point of interconnection11083 Riverton 138kV
Requested (queue) date2013-01-20
Proposed in-service date2019-12-20
Operational date2019-12-20
Withdrawn date
DeveloperEon
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata