West Queue Project Q15A — Wind in Kern, California

West Queue Project Q15A — Wind in Kern, California is a 150.0 MW wind interconnection project in Kern, California with a current status of withdrawn. It is proposed to connect at Pine Tree 230kV Substation.

150.0 MWCapacity
WithdrawnStatus
WestMarket
WindTechnology

Project facts

Canonical nameWest Queue Project Q15A — Wind in Kern, California
Queue IDQ15A
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologyWind
Capacity150.0 MW
StateCalifornia
CountyKern
Point of interconnectionPine Tree 230kV Substation
Requested (queue) date2010-10-12
Proposed in-service date2018-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerLos Angeles Department of Water and Power

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.