Western Flats Solar (26INR0110)

Western Flats Solar is a 410.2 MW solar interconnection project in Crane, Texas with a current status of operational. It is proposed to connect at Tap 138 kV 76615 Crane -76635 King Mountain; POI is 7.85 miles from Crane..

410.2 MWCapacity
OperationalStatus
CraneMarket
SolarTechnology

Project facts

Canonical nameWestern Flats Solar
Queue ID26INR0110
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketCrane
TechnologySolar
Capacity410.2 MW
StateTexas
CountyCrane
Point of interconnectionTap 138 kV 76615 Crane -76635 King Mountain; POI is 7.85 miles from Crane.
Requested (queue) date2023-04-07
Proposed in-service date
Operational date2028-11-01
Withdrawn date
DeveloperHecate Energy
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata