Wharton BESS (22INR0608)
Wharton BESS is a 10.0 MW battery interconnection project in Wharton, Texas with a current status of operational. It is proposed to connect at Property: 29.3134928 N, 96.1081571 W. Site is adjacent to Centerpoint substation. Station Name (TDSP Station Code): WR (Wharton)_x000D_ Load/Load Transformer Name:TR4_x000D_ PTI BUS number #43570 Voltage in kV (Transmission): 138 kV transmission voltage.
Project facts
| Canonical name | Wharton BESS |
|---|---|
| Queue ID | 22INR0608 |
| Status | operational |
| Source status | operational |
| Market | ERCOT |
| Technology | Battery |
| Capacity | 10.0 MW |
| State | Texas |
| County | Wharton |
| Point of interconnection | Property: 29.3134928 N, 96.1081571 W. Site is adjacent to Centerpoint substation. Station Name (TDSP Station Code): WR (Wharton)_x000D_ Load/Load Transformer Name:TR4_x000D_ PTI BUS number #43570 Voltage in kV (Transmission): 138 kV transmission voltage |
| Requested (queue) date | 2022-11-08 |
| Proposed in-service date | 2025-12-08 |
| Operational date | 2025-12-18 |
| Withdrawn date | — |
| Developer | I-eye Storage LLC |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata