Whatley Solar (16INR0106)

Whatley Solar is a 150.0 MW solar interconnection project in Andrews, Texas with a current status of suspended. It is proposed to connect at 1281 Amoco Midland tap 69kV.

150.0 MWCapacity
SuspendedStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameWhatley Solar
Queue ID16INR0106
Statussuspended
Source statussuspended
MarketERCOT
TechnologySolar
Capacity150.0 MW
StateTexas
CountyAndrews
Point of interconnection1281 Amoco Midland tap 69kV
Requested (queue) date2015-05-04
Proposed in-service date2020-12-31
Operational date
Withdrawn date2019-10-11
DeveloperInvenergy
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.