Wing River- Riverton 230kV line (J1221)

Wing River- Riverton 230kV line is a 150.0 MW solar interconnection project in Wadena County, Minnesota with a current status of operational. It is proposed to connect at Wing River- Riverton 230kV line.

150.0 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical nameWing River- Riverton 230kV line
Queue IDJ1221
Statusoperational
Source statusDone
Market
TechnologySolar
Capacity150.0 MW
StateMinnesota
CountyWadena County
Point of interconnectionWing River- Riverton 230kV line
Requested (queue) date2019-04-27
Proposed in-service date2023-10-30
Operational date2023-10-30
Withdrawn date
Developer
Utility / transmission ownerGREAT RIVER ENERGY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.