Wing River- Riverton 230kV line (J1230)

Wing River- Riverton 230kV line is a 40.0 MW battery interconnection project in Wadena County, Minnesota with a current status of withdrawn. It is proposed to connect at Wing River- Riverton 230kV line.

40.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameWing River- Riverton 230kV line
Queue IDJ1230
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity40.0 MW
StateMinnesota
CountyWadena County
Point of interconnectionWing River- Riverton 230kV line
Requested (queue) date2019-04-27
Proposed in-service date2023-10-30
Operational date2023-10-30
Withdrawn date2021-03-24
Developer
Utility / transmission ownerGREAT RIVER ENERGY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.