Winn Hill Solar (C24-295)

Winn Hill Solar is a 60.0 MW solar interconnection project in Broome, New York with a current status of withdrawn. It is proposed to connect at Kattelville to Jennison Line Tap 115 kV.

60.0 MWCapacity
WithdrawnStatus
NYISOMarket
SolarTechnology

Project facts

Canonical nameWinn Hill Solar
Queue IDC24-295
Statuswithdrawn
Source statuswithdrawn
MarketNYISO
TechnologySolar
Capacity60.0 MW
StateNew York
CountyBroome
Point of interconnectionKattelville to Jennison Line Tap 115 kV
Requested (queue) date2024-09-27
Proposed in-service date
Operational date
Withdrawn date
DeveloperACE DEVCO NC, LLC
Utility / transmission ownerNYSEG

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata