Wolf Bone North Energy Center (29INR0354)
Wolf Bone North Energy Center is a 1,174.4 MW gas interconnection project in Reeves, Texas with a current status of active. It is proposed to connect at TNMP Cowpen 345kV Substation POIB 38044 (4 mile transmission line will connect POI at customer substation to POIB in the Cowpen substation).
1,174.4 MWCapacity
ActiveStatus
ReevesMarket
GasTechnology
Project facts
| Canonical name | Wolf Bone North Energy Center |
|---|---|
| Queue ID | 29INR0354 |
| Status | active |
| Source status | SS Started, FIS Started, No IA |
| Market | Reeves |
| Technology | Gas |
| Capacity | 1,174.4 MW |
| State | Texas |
| County | Reeves |
| Point of interconnection | TNMP Cowpen 345kV Substation POIB 38044 (4 mile transmission line will connect POI at customer substation to POIB in the Cowpen substation) |
| Requested (queue) date | 2026-09-04 |
| Proposed in-service date | 2031-02-28 |
| Operational date | — |
| Withdrawn date | — |
| Developer | NRG Energy, Inc. |
| Utility / transmission owner | ERCOT |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-10-30 | new_project | — | active | high |
Explore related data
Source last checked2026-10-30
Data last materially changed2026-10-30
Page data generated2026-11-26
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata