Wolf Creek-Blackberry 345 kV (GEN-2022-053)
Wolf Creek-Blackberry 345 kV is a 137.5 MW solar interconnection project in Barton, Missouri with a current status of withdrawn. It is proposed to connect at Wolf Creek-Blackberry 345 kV.
137.5 MWCapacity
WithdrawnStatus
MOMarket
SolarTechnology
Project facts
| Canonical name | Wolf Creek-Blackberry 345 kV |
|---|---|
| Queue ID | GEN-2022-053 |
| Status | withdrawn |
| Source status | WITHDRAWN |
| Market | MO |
| Technology | Solar |
| Capacity | 137.5 MW |
| State | Missouri |
| County | Barton |
| Point of interconnection | Wolf Creek-Blackberry 345 kV |
| Requested (queue) date | 2022-06-23 |
| Proposed in-service date | 2025-12-31 |
| Operational date | — |
| Withdrawn date | 2023-05-31 |
| Developer | — |
| Utility / transmission owner | NEET |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata