YELLOW LIGHT SOLAR (21INR0352)

YELLOW LIGHT SOLAR is a 151.8 MW solar interconnection project in Schleicher, Texas with a current status of withdrawn. It is proposed to connect at 6500 Live Oak 138kV_x000D_ .

151.8 MWCapacity
WithdrawnStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameYELLOW LIGHT SOLAR
Queue ID21INR0352
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologySolar
Capacity151.8 MW
StateTexas
CountySchleicher
Point of interconnection6500 Live Oak 138kV_x000D_
Requested (queue) date2019-05-20
Proposed in-service date2022-05-07
Operational date
Withdrawn date2021-02-16
DeveloperABEI ENERGY&INFRASTRUCTURE LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.