YELLOW PINE 2 (1341)

YELLOW PINE 2 is a 250.0 MW solar+battery interconnection project in Clark, Nevada with a current status of operational. It is proposed to connect at Crazy Eyes Substation 230 kV.

250.0 MWCapacity
OperationalStatus
NoneMarket
Solar+BatteryTechnology

Project facts

Canonical nameYELLOW PINE 2
Queue ID1341
Statusoperational
Source statusCOMPLETED
MarketNone
TechnologySolar+Battery
Capacity250.0 MW
StateNevada
CountyClark
Point of interconnectionCrazy Eyes Substation 230 kV
Requested (queue) date2016-05-02
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerGLW

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.