YERMO SOLAR 1 (1304)

YERMO SOLAR 1 is a 70.7 MW solar interconnection project in San Bernadino, California with a current status of withdrawn. It is proposed to connect at Cool WaterDunn Siding Baker Mount Pass Ivanpah 115 kV Line.

70.7 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameYERMO SOLAR 1
Queue ID1304
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologySolar
Capacity70.7 MW
StateCalifornia
CountySan Bernadino
Point of interconnectionCool WaterDunn Siding Baker Mount Pass Ivanpah 115 kV Line
Requested (queue) date2016-05-02
Proposed in-service date
Operational date
Withdrawn date2016-06-29
Developer
Utility / transmission ownerSCE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.