Yoakum-Seagraves 115kV circuit (GEN-2016-090)

Yoakum-Seagraves 115kV circuit is a 100.0 MW solar interconnection project in Terry, Texas with a current status of withdrawn. It is proposed to connect at Yoakum-Seagraves 115kV circuit.

100.0 MWCapacity
WithdrawnStatus
TXMarket
SolarTechnology

Project facts

Canonical nameYoakum-Seagraves 115kV circuit
Queue IDGEN-2016-090
Statuswithdrawn
Source statusWITHDRAWN
MarketTX
TechnologySolar
Capacity100.0 MW
StateTexas
CountyTerry
Point of interconnectionYoakum-Seagraves 115kV circuit
Requested (queue) date2016-09-28
Proposed in-service date
Operational date
Withdrawn date2020-12-07
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata