Young Wind II (23INR0493)

Young Wind II is a 152.3 MW wind interconnection project in Young, Texas with a current status of withdrawn. It is proposed to connect at Thomas Price.

152.3 MWCapacity
WithdrawnStatus
ERCOTMarket
WindTechnology

Project facts

Canonical nameYoung Wind II
Queue ID23INR0493
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologyWind
Capacity152.3 MW
StateTexas
CountyYoung
Point of interconnectionThomas Price
Requested (queue) date
Proposed in-service date2023-12-31
Operational date
Withdrawn date2022-11-02
DeveloperYoung Wind, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata