Zuma Solar (30INR0076)

Zuma Solar is a 201.4 MW solar interconnection project in Runnels, Texas with a current status of operational. It is proposed to connect at Tap 345kV 11263 Fisk Switch - 11406 Central Bluff Switch .

201.4 MWCapacity
OperationalStatus
RunnelsMarket
SolarTechnology

Project facts

Canonical nameZuma Solar
Queue ID30INR0076
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketRunnels
TechnologySolar
Capacity201.4 MW
StateTexas
CountyRunnels
Point of interconnectionTap 345kV 11263 Fisk Switch - 11406 Central Bluff Switch
Requested (queue) date2026-04-02
Proposed in-service date
Operational date2030-09-09
Withdrawn date
DeveloperZuma Solar, LLC
Utility / transmission ownerERCOT

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata