Gulf County, Florida — Interconnection Projects
The interXdata warehouse tracks 6 interconnection projects in Gulf, Florida, representing 343 MW of requested capacity.
6Total projects
1Active
1Operational
4Withdrawn
343 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Other | 4 | 263 MW |
| Solar | 1 | 75 MW |
| Battery | 1 | 6 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Duke Energy Florida, LLC Flo Pr aid ra R ee rsn ,e Lw La Cble | 075516 | Solar | 74.9 MW | active | Gulf, Florida |
| FL Queue Project 027200 — Other in Gulf, Florida | 027200 | Other | 70.0 MW | withdrawn | Gulf, Florida |
| Southeast Queue Project 101 — Other in Gulf, Florida | 101 | Other | 70.0 MW | withdrawn | Gulf, Florida |
| FL Queue Project 027236 — Other in Gulf, Florida | 027236 | Other | 61.5 MW | withdrawn | Gulf, Florida |
| Southeast Queue Project 108 — Other in Gulf, Florida | 108 | Other | 61.5 MW | withdrawn | Gulf, Florida |
| Cape San Blas | 63996_ES1 | Battery | 5.5 MW | operational | Gulf, Florida |
Top developers
| Developer (canonical) | Projects | Capacity |
|---|---|---|
| Duke Energy Florida, LLC | 1 | 75 MW |
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: duke-def-oasis; U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Gulf County.
Start tracking with interXdata