Lee County, Georgia — Interconnection Projects

The interXdata warehouse tracks 6 interconnection projects in Lee, Georgia, representing 689 MW of requested capacity.

6Total projects
1Active
5Operational
0Withdrawn
689 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Solar4428 MW
Gas2261 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
SR DeSoto I, LLC64841_SOTOISolar165.0 MWoperationalLee, Georgia
Walton Discover (aka Goat Rock)GI-020Gas150.0 MWoperationalLee, Georgia
SR DeSoto IGI-117Solar138.0 MWoperationalLee, Georgia
Southeast Queue Project 25-IC-1320B — Gas in Lee, Georgia25-IC-1320BGas111.0 MWactiveLee, Georgia
SR DeSoto II66172_SOTO2Solar65.0 MWoperationalLee, Georgia
SR DeSoto III66825_SOTO3Solar60.0 MWoperationalLee, Georgia

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Lee County.

Start tracking with interXdata