Keith County, Nebraska — Interconnection Projects

The interXdata warehouse tracks 5 interconnection projects in Keith, Nebraska, representing 1,040 MW of requested capacity.

5Total projects
0Active
1Operational
4Withdrawn
1,040 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Wind3790 MW
Solar1200 MW
Other150 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Gerald Gentleman Station 345kVGEN-2016-106Wind400.0 MWwithdrawnKeith, Nebraska
Ogallala 230kVGEN-2013-021Wind229.5 MWwithdrawnKeith, Nebraska
Elsie Tap - Paxton 115 kV LineGEN-2023-071Solar200.0 MWwithdrawnKeith, Nebraska
Tap Sidney - Ogallala 230kV lineGEN-2014-059Wind160.0 MWwithdrawnKeith, Nebraska
Kingsley785_1Other50.0 MWoperationalKeith, Nebraska

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Keith County.

Start tracking with interXdata