Keith County, Nebraska — Interconnection Projects
The interXdata warehouse tracks 5 interconnection projects in Keith, Nebraska, representing 1,040 MW of requested capacity.
5Total projects
0Active
1Operational
4Withdrawn
1,040 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Wind | 3 | 790 MW |
| Solar | 1 | 200 MW |
| Other | 1 | 50 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Gerald Gentleman Station 345kV | GEN-2016-106 | Wind | 400.0 MW | withdrawn | Keith, Nebraska |
| Ogallala 230kV | GEN-2013-021 | Wind | 229.5 MW | withdrawn | Keith, Nebraska |
| Elsie Tap - Paxton 115 kV Line | GEN-2023-071 | Solar | 200.0 MW | withdrawn | Keith, Nebraska |
| Tap Sidney - Ogallala 230kV line | GEN-2014-059 | Wind | 160.0 MW | withdrawn | Keith, Nebraska |
| Kingsley | 785_1 | Other | 50.0 MW | operational | Keith, Nebraska |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.