Tap Sidney - Ogallala 230kV line (GEN-2014-059)

Tap Sidney - Ogallala 230kV line is a 160.0 MW wind interconnection project in Keith, Nebraska with a current status of withdrawn. It is proposed to connect at Tap Sidney - Ogallala 230kV line.

160.0 MWCapacity
WithdrawnStatus
NEMarket
WindTechnology

Project facts

Canonical nameTap Sidney - Ogallala 230kV line
Queue IDGEN-2014-059
Statuswithdrawn
Source statusWITHDRAWN
MarketNE
TechnologyWind
Capacity160.0 MW
StateNebraska
CountyKeith
Point of interconnectionTap Sidney - Ogallala 230kV line
Requested (queue) date2014-09-30
Proposed in-service date
Operational date
Withdrawn date2016-03-17
Developer
Utility / transmission ownerNPPD

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata