Turner County, South Dakota — Interconnection Projects

The interXdata warehouse tracks 4 interconnection projects in Turner, South Dakota, representing 525 MW of requested capacity.

4Total projects
1Active
1Operational
2Withdrawn
525 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Wind3520 MW
Other15 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Vfodnes-Utica Jct. 230kVGEN-2017-175Wind270.0 MWactiveTurner, South Dakota
MISO Queue Project G878 — Wind in Turner, South DakotaG878Wind150.0 MWwithdrawnTurner, South Dakota
MISO Queue Project G727 — Wind in Turner, South DakotaG727Wind100.0 MWwithdrawnTurner, South Dakota
POET Biorefining - Chancellor63853_1Other5.4 MWoperationalTurner, South Dakota

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.