Turner County, South Dakota — Interconnection Projects
The interXdata warehouse tracks 4 interconnection projects in Turner, South Dakota, representing 525 MW of requested capacity.
4Total projects
1Active
1Operational
2Withdrawn
525 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Wind | 3 | 520 MW |
| Other | 1 | 5 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Vfodnes-Utica Jct. 230kV | GEN-2017-175 | Wind | 270.0 MW | active | Turner, South Dakota |
| MISO Queue Project G878 — Wind in Turner, South Dakota | G878 | Wind | 150.0 MW | withdrawn | Turner, South Dakota |
| MISO Queue Project G727 — Wind in Turner, South Dakota | G727 | Wind | 100.0 MW | withdrawn | Turner, South Dakota |
| POET Biorefining - Chancellor | 63853_1 | Other | 5.4 MW | operational | Turner, South Dakota |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Turner County.
Start tracking with interXdata