Yankton County, South Dakota — Interconnection Projects

The interXdata warehouse tracks 8 interconnection projects in Yankton, South Dakota, representing 562 MW of requested capacity.

8Total projects
0Active
5Operational
3Withdrawn
562 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Wind3488 MW
Battery160 MW
Gas29 MW
Other25 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
West Queue Project GI-0705 — Wind in Yankton, South DakotaGI-0705Wind250.0 MWwithdrawnYankton, South Dakota
Prevailing Wind Park62247_PWPSDWind220.0 MWoperationalYankton, South Dakota
GEN-2019-040GEN-2019-040Battery60.0 MWwithdrawnYankton, South Dakota
Utica Junction 230 kV substationGEN-2018-070Wind18.3 MWwithdrawnYankton, South Dakota
Yankton8034_3Gas6.5 MWoperationalYankton, South Dakota
Yankton8034_2Other2.7 MWoperationalYankton, South Dakota
Yankton8034_1Gas2.2 MWoperationalYankton, South Dakota
Yankton8034_4Other2.0 MWoperationalYankton, South Dakota

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Yankton County.