Utica Junction 230 kV substation (GEN-2018-070)

Utica Junction 230 kV substation is a 18.3 MW wind interconnection project in Yankton, South Dakota with a current status of withdrawn. It is proposed to connect at Utica Junction 230 kV substation.

18.3 MWCapacity
WithdrawnStatus
SDMarket
WindTechnology

Project facts

Canonical nameUtica Junction 230 kV substation
Queue IDGEN-2018-070
Statuswithdrawn
Source statusWITHDRAWN
MarketSD
TechnologyWind
Capacity18.3 MW
StateSouth Dakota
CountyYankton
Point of interconnectionUtica Junction 230 kV substation
Requested (queue) date2018-10-29
Proposed in-service date2020-04-22
Operational date
Withdrawn date2023-09-27
Developer
Utility / transmission ownerWAPA/BEPC/HCPD Integrated System

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.