Bowie County, Texas — Interconnection Projects
The interXdata warehouse tracks 9 interconnection projects in Bowie, Texas, representing 1,407 MW of requested capacity.
9Total projects
2Active
2Operational
5Withdrawn
1,407 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 6 | 782 MW |
| Solar+Battery | 1 | 400 MW |
| Battery | 2 | 225 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| SPP Queue Project GEN-2023-212 — Solar+Battery in Bowie, Texas | GEN-2023-212 | Solar+Battery | 400.0 MW | withdrawn | Bowie, Texas |
| Lydia - Northwest Texarkana 345 kV | GEN-2023-080 | Solar | 200.0 MW | withdrawn | Bowie, Texas |
| Lydia 345 kV Substation | GEN-2024-025 | Solar | 150.0 MW | operational | Bowie, Texas |
| North Boston-Bann 138kV Line | GEN-2018-003 | Solar | 150.0 MW | active | Bowie, Texas |
| North Boston - Bann 138 kV Line Tap | GEN-2023-137 | Battery | 150.0 MW | withdrawn | Bowie, Texas |
| Lydia 345kV substation | GEN-2018-088 | Solar | 130.0 MW | withdrawn | Bowie, Texas |
| Lydia 345 kV Substation | GEN-2024-241 | Solar | 100.0 MW | operational | Bowie, Texas |
| Lydia 345kV substation | GEN-2018-087 | Battery | 75.0 MW | withdrawn | Bowie, Texas |
| Lydia 345kV substation | GEN-2023-135 | Solar | 52.0 MW | active | Bowie, Texas |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-28
Page data generated2026-08-28
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Bowie County.
Start tracking with interXdata