Bowie County, Texas — Interconnection Projects

The interXdata warehouse tracks 9 interconnection projects in Bowie, Texas, representing 1,407 MW of requested capacity.

9Total projects
2Active
2Operational
5Withdrawn
1,407 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Solar6782 MW
Solar+Battery1400 MW
Battery2225 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
SPP Queue Project GEN-2023-212 — Solar+Battery in Bowie, TexasGEN-2023-212Solar+Battery400.0 MWwithdrawnBowie, Texas
Lydia - Northwest Texarkana 345 kVGEN-2023-080Solar200.0 MWwithdrawnBowie, Texas
Lydia 345 kV SubstationGEN-2024-025Solar150.0 MWoperationalBowie, Texas
North Boston-Bann 138kV LineGEN-2018-003Solar150.0 MWactiveBowie, Texas
North Boston - Bann 138 kV Line TapGEN-2023-137Battery150.0 MWwithdrawnBowie, Texas
Lydia 345kV substationGEN-2018-088Solar130.0 MWwithdrawnBowie, Texas
Lydia 345 kV SubstationGEN-2024-241Solar100.0 MWoperationalBowie, Texas
Lydia 345kV substationGEN-2018-087Battery75.0 MWwithdrawnBowie, Texas
Lydia 345kV substationGEN-2023-135Solar52.0 MWactiveBowie, Texas

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Bowie County.

Start tracking with interXdata