SPP Queue Project GEN-2023-212 — Solar+Battery in Bowie, Texas

SPP Queue Project GEN-2023-212 — Solar+Battery in Bowie, Texas is a 400.0 MW solar+battery interconnection project in Bowie, Texas with a current status of withdrawn. It is proposed to connect at Northwest Texarkana - Valliant 345 kV Line.

400.0 MWCapacity
WithdrawnStatus
SPPMarket
Solar+BatteryTechnology

Project facts

Canonical nameSPP Queue Project GEN-2023-212 — Solar+Battery in Bowie, Texas
Queue IDGEN-2023-212
Statuswithdrawn
Source statuswithdrawn
MarketSPP
TechnologySolar+Battery
Capacity400.0 MW
StateTexas
CountyBowie
Point of interconnectionNorthwest Texarkana - Valliant 345 kV Line
Requested (queue) date2023-10-02
Proposed in-service date2027-12-01
Operational date
Withdrawn date2025-08-25
Developer
Utility / transmission ownerAEP

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata