Crockett County, Texas — Interconnection Projects
The interXdata warehouse tracks 26 interconnection projects in Crockett, Texas, representing 6,906 MW of requested capacity.
26Total projects
1Active
19Operational
5Withdrawn
6,906 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Wind | 13 | 3,474 MW |
| Solar | 6 | 2,291 MW |
| Other | 6 | 1,042 MW |
| Battery | 1 | 100 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Corner Solar | 21INR0282 | Solar | 1,221.6 MW | withdrawn | Crockett, Texas |
| Midnight Sun Energy Storage | 24INR0442 | Other | 523.9 MW | operational | Crockett, Texas |
| White Mesa Wind | 64710_WM001 | Wind | 500.6 MW | operational | Crockett, Texas |
| High Lonesome Wind | 19INR0038 | Wind | 449.5 MW | operational | Crockett, Texas |
| Gridline Solar | 29INR0184 | Solar | 400.0 MW | operational | Crockett, Texas |
| Santa Rita Solar | 18INR0049 | Solar | 400.0 MW | withdrawn | Crockett, Texas |
| White Mesa 2 Wind | 21INR0521 | Wind | 348.0 MW | operational | Crockett, Texas |
| Ranchero Wind | 20INR0011 | Wind | 300.0 MW | operational | Crockett, Texas |
| Ranchero Wind Farm LLC | 62259_RAN | Wind | 300.0 MW | operational | Crockett, Texas |
| Big Sampson Wind | 16INR0104 | Other | 265.4 MW | operational | Crockett, Texas |
| Big Sampson Wind | 68873_BIGS | Wind | 265.0 MW | active | Crockett, Texas |
| Shamrock II Wind | 28INR0012 | Wind | 256.6 MW | suspended | Crockett, Texas |
| Shamrock | 22INR0502 | Wind | 223.9 MW | operational | Crockett, Texas |
| Shamrock Wind | 66540_WSHAM | Wind | 223.9 MW | operational | Crockett, Texas |
| Shamrock Wind II | 19INR0097 | Wind | 201.6 MW | withdrawn | Crockett, Texas |
| Shamrock Wind | 19INR0096 | Wind | 201.6 MW | withdrawn | Crockett, Texas |
| White Mesa Wind | 19INR0128 | Wind | 152.3 MW | operational | Crockett, Texas |
| Ranchero BESS | 25INR0489 | Other | 150.0 MW | operational | Crockett, Texas |
| BLACK BEAR SOLAR | 26INR0365 | Solar | 102.9 MW | operational | Crockett, Texas |
| Blue Sky Sol | 22INR0455 | Solar | 101.2 MW | operational | Crockett, Texas |
| Shamrock Wind | 66540_SES | Battery | 100.0 MW | operational | Crockett, Texas |
| Blue Sky Solar | 23INR0025 | Solar | 65.0 MW | withdrawn | Crockett, Texas |
| BLACK BEAR BESS | 26INR0366 | Other | 51.2 MW | operational | Crockett, Texas |
| High Lonesome BESS | 20INR0280 | Other | 51.1 MW | operational | Crockett, Texas |
| High Lonesome Wind Phase II | 20INR0262 | Wind | 50.6 MW | operational | Crockett, Texas |
| Blue Sky Storage SLF | 25INR0216 | Other | 0.0 MW | operational | Crockett, Texas |
Top developers
| Developer (canonical) | Projects | Capacity |
|---|---|---|
| Eon | 2 | 403 MW |
| Blue Sky Solar LLC | 2 | 166 MW |
| White Mesa Wind, LLC | 2 | 500 MW |
| ESCONDIDO DRAW RESOURCES, LLC | 2 | 154 MW |
| Scout Clean Energy LLC | 1 | 300 MW |
| Big Lake Ranch LLC | 1 | 400 MW |
| Midnight Sun Energy Storage, LLC | 1 | 524 MW |
| High Lonesome Storage, LLC | 1 | 51 MW |
| Invenergy | 1 | 400 MW |
| Big Sampson Wind Project, LLC | 1 | 265 MW |
| High Lonesome Wind Power, LLC | 1 | 51 MW |
| Enel X | 1 | 450 MW |
| Shamrock Interconnection LLC | 1 | 224 MW |
| Ranchero Battery Facility, LLC | 1 | 150 MW |
| Shannon Solar LLC | 1 | 1,222 MW |
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); ERCOT — Generation Interconnection Status (GIS) report; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Crockett County.
Start tracking with interXdata