Erath County, Texas — Interconnection Projects

The interXdata warehouse tracks 12 interconnection projects in Erath, Texas, representing 1,741 MW of requested capacity.

12Total projects
3Active
7Operational
2Withdrawn
1,741 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Other4660 MW
Solar3421 MW
Solar+Battery2406 MW
Wind2153 MW
Battery1101 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
McCrae Energy Storage25INR0661Other306.4 MWoperationalErath, Texas
Glory Bee Solar24INR0368Solar+Battery305.0 MWactiveErath, Texas
Erath County Solar23INR0202Solar207.4 MWoperationalErath, Texas
Erath County Solar67353_4666Solar204.0 MWactiveErath, Texas
Field Marshal Storage28INR0290Other150.8 MWoperationalErath, Texas
Ambrose Energy Storage25INR0563Other101.2 MWwithdrawnErath, Texas
Palm Bluff Energy Storage25INR0540Other101.2 MWwithdrawnErath, Texas
Glory Bee Storage24INR0369Solar+Battery101.0 MWactiveErath, Texas
Lucky Bluff BESS SLF24INR0295Battery100.8 MWoperationalErath, Texas
Buckthorn Wind60983_BWINDWind100.5 MWoperationalErath, Texas
Silver Star I Wind Power Project56771_1Wind52.8 MWoperationalErath, Texas
TPE Erath Solar, LLC64892_ERATHSolar9.9 MWoperationalErath, Texas

Top developers

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); ERCOT — Generation Interconnection Status (GIS) report; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Erath County.

Start tracking with interXdata