Palm Bluff Energy Storage is a 101.2 MW other interconnection project in Erath, Texas with a current status of withdrawn. It is proposed to connect at 138kV tap on Dublin1_8 #1636 to Stphnvil_8 #1641 transmission line..

101.2 MWCapacity
WithdrawnStatus
ERCOTMarket
OtherTechnology

Project facts

Canonical namePalm Bluff Energy Storage
Queue ID25INR0540
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologyOther
Capacity101.2 MW
StateTexas
CountyErath
Point of interconnection138kV tap on Dublin1_8 #1636 to Stphnvil_8 #1641 transmission line.
Requested (queue) date2023-10-12
Proposed in-service date2027-04-15
Operational date
Withdrawn date2024-04-01
DeveloperPalm Bluff Energy Storage, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata