Lee County, Texas — Interconnection Projects
The interXdata warehouse tracks 7 interconnection projects in Lee, Texas, representing 1,826 MW of requested capacity.
7Total projects
5Active
0Operational
2Withdrawn
1,826 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Gas | 2 | 1,290 MW |
| Battery | 1 | 154 MW |
| Solar | 1 | 151 MW |
| Other | 1 | 151 MW |
| Solar+Battery | 2 | 81 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Sandow Lakes Energy Station | 68504_SLES1 | Gas | 645.0 MW | active | Lee, Texas |
| Sandow Lakes Energy Station | 68504_SLES2 | Gas | 645.0 MW | active | Lee, Texas |
| Bonaparte BESS | 26INR0283 | Battery | 153.7 MW | active | Lee, Texas |
| Schoolhouse Solar | 22INR0211 | Solar | 150.8 MW | withdrawn | Lee, Texas |
| Schoolhouse BESS | 24INR0345 | Other | 150.7 MW | withdrawn | Lee, Texas |
| Hooper Solar | 24INR0473 | Solar+Battery | 50.5 MW | active | Lee, Texas |
| Hooper Storage | 24INR0474 | Solar+Battery | 30.7 MW | active | Lee, Texas |
Top developers
| Developer (canonical) | Projects | Capacity |
|---|---|---|
| BT Brown Solar, LLC | 2 | 81 MW |
| Schoolhouse Solar, LLC | 1 | 151 MW |
| Schoolhouse Storage, LLC | 1 | 151 MW |
| Bonaparte BESS, LLC | 1 | 154 MW |
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Lee County.
Start tracking with interXdata