Lee County, Texas — Interconnection Projects

The interXdata warehouse tracks 7 interconnection projects in Lee, Texas, representing 1,826 MW of requested capacity.

7Total projects
5Active
0Operational
2Withdrawn
1,826 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Gas21,290 MW
Battery1154 MW
Solar1151 MW
Other1151 MW
Solar+Battery281 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Sandow Lakes Energy Station68504_SLES1Gas645.0 MWactiveLee, Texas
Sandow Lakes Energy Station68504_SLES2Gas645.0 MWactiveLee, Texas
Bonaparte BESS26INR0283Battery153.7 MWactiveLee, Texas
Schoolhouse Solar22INR0211Solar150.8 MWwithdrawnLee, Texas
Schoolhouse BESS24INR0345Other150.7 MWwithdrawnLee, Texas
Hooper Solar24INR0473Solar+Battery50.5 MWactiveLee, Texas
Hooper Storage24INR0474Solar+Battery30.7 MWactiveLee, Texas

Top developers

Developer (canonical)ProjectsCapacity
BT Brown Solar, LLC281 MW
Schoolhouse Solar, LLC1151 MW
Schoolhouse Storage, LLC1151 MW
Bonaparte BESS, LLC1154 MW

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Lee County.

Start tracking with interXdata