Schoolhouse BESS (24INR0345)

Schoolhouse BESS is a 150.7 MW other interconnection project in Lee, Texas with a current status of withdrawn. It is proposed to connect at tap 345kV 7040 Austrop - 13429 Sandow.

150.7 MWCapacity
WithdrawnStatus
ERCOTMarket
OtherTechnology

Project facts

Canonical nameSchoolhouse BESS
Queue ID24INR0345
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologyOther
Capacity150.7 MW
StateTexas
CountyLee
Point of interconnectiontap 345kV 7040 Austrop - 13429 Sandow
Requested (queue) date2022-06-16
Proposed in-service date2025-11-01
Operational date
Withdrawn date2024-12-09
DeveloperSchoolhouse Storage, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.