Lynn County, Texas — Interconnection Projects
The interXdata warehouse tracks 8 interconnection projects in Lynn, Texas, representing 1,920 MW of requested capacity.
8Total projects
2Active
6Operational
0Withdrawn
1,920 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Wind | 5 | 1,338 MW |
| Other | 1 | 282 MW |
| Solar | 1 | 250 MW |
| Battery | 1 | 50 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Sage Draw Wind | 62620_SD | Wind | 338.4 MW | operational | Lynn, Texas |
| Sage Draw Wind | 19INR0163 | Wind | 338.0 MW | operational | Lynn, Texas |
| Tahoka Wind | 18INR0025 | Wind | 300.0 MW | operational | Lynn, Texas |
| Tahoka Wind | 61921_TAH | Wind | 300.0 MW | operational | Lynn, Texas |
| Impala Flats Wind | 20INR0233 | Other | 282.0 MW | operational | Lynn, Texas |
| TREX US Red Holly | 63202_701 | Solar | 250.0 MW | active | Lynn, Texas |
| Cirrus Wind 1 LLC | 58162_CW | Wind | 61.2 MW | operational | Lynn, Texas |
| TREX US Red Holly | 63202_701-S | Battery | 50.0 MW | active | Lynn, Texas |
Top developers
| Developer (canonical) | Projects | Capacity |
|---|---|---|
| Lincoln Clean | 2 | 638 MW |
| Antelope Flats Wind, LLC | 1 | 282 MW |
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); ERCOT — Generation Interconnection Status (GIS) report; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Lynn County.
Start tracking with interXdata