Martin County, Texas — Interconnection Projects
The interXdata warehouse tracks 6 interconnection projects in Martin, Texas, representing 791 MW of requested capacity.
6Total projects
0Active
4Operational
1Withdrawn
791 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Other | 3 | 492 MW |
| Wind | 1 | 120 MW |
| Battery | 1 | 103 MW |
| Solar | 1 | 77 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Jane Storage Energy Center | 26INR0247 | Other | 240.6 MW | operational | Martin, Texas |
| Stewart Grady BESS | 25INR0396 | Other | 150.5 MW | operational | Martin, Texas |
| Stanton Wind Energy LLC | 56644_1 | Wind | 120.0 MW | operational | Martin, Texas |
| Millennium Energy Storage | 25INR0431 | Battery | 102.6 MW | suspended | Martin, Texas |
| Picadillo BESS | 24INR0275 | Other | 100.8 MW | operational | Martin, Texas |
| Augustus Solar | 26INR0037 | Solar | 76.7 MW | withdrawn | Martin, Texas |
Top developers
| Developer (canonical) | Projects | Capacity |
|---|---|---|
| NMRE Holdings, LLC | 1 | 241 MW |
| Grady BESS | 1 | 150 MW |
| Industrial Golf Project LLC | 1 | 77 MW |
| Black Mountain Energy Storage II | 1 | 101 MW |
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); ERCOT — Generation Interconnection Status (GIS) report; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Martin County.
Start tracking with interXdata