Mason County, Texas — Interconnection Projects

The interXdata warehouse tracks 4 interconnection projects in Mason, Texas, representing 220 MW of requested capacity.

4Total projects
0Active
4Operational
0Withdrawn
220 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Other2110 MW
Battery2110 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Bat Cave Energy Storage21INR0365Other100.5 MWoperationalMason, Texas
Bat Cave64312_BCBattery100.0 MWoperationalMason, Texas
Regis Mason69345_MASONBattery9.9 MWoperationalMason, Texas
Fort Mason BESS23INR0500Other9.8 MWoperationalMason, Texas

Top developers

Developer (canonical)ProjectsCapacity
Regis Mason LLC110 MW
Bat Cave Energy Storage1100 MW

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Mason County.

Start tracking with interXdata