Fort Mason BESS (23INR0500)
Fort Mason BESS is a 9.8 MW other interconnection project in Mason, Texas with a current status of operational. It is proposed to connect at Station Name (TDSP Station Code): FORTMA; Load/Load Transformer Name: T1-FM140; PTI BUS number: 76390; Voltage in kV (Transmission Level): 138kV_x000D_ Transformer: 3x 4000kVA 800VAC Δ - 12.47kVA Υ.
Project facts
| Canonical name | Fort Mason BESS |
|---|---|
| Queue ID | 23INR0500 |
| Status | operational |
| Source status | operational |
| Market | ERCOT |
| Technology | Other |
| Capacity | 9.8 MW |
| State | Texas |
| County | Mason |
| Point of interconnection | Station Name (TDSP Station Code): FORTMA; Load/Load Transformer Name: T1-FM140; PTI BUS number: 76390; Voltage in kV (Transmission Level): 138kV_x000D_ Transformer: 3x 4000kVA 800VAC Δ - 12.47kVA Υ |
| Requested (queue) date | 2023-08-18 |
| Proposed in-service date | 2025-06-27 |
| Operational date | 2024-11-07 |
| Withdrawn date | — |
| Developer | Regis Mason LLC |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.