McCulloch County, Texas — Interconnection Projects

The interXdata warehouse tracks 8 interconnection projects in McCulloch, Texas, representing 1,562 MW of requested capacity.

8Total projects
2Active
6Operational
0Withdrawn
1,562 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Wind3520 MW
Solar2490 MW
Other2351 MW
Battery1201 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Biggs Solar28INR0111Solar400.0 MWoperationalMcCulloch, Texas
Trelas24INR0416Battery200.8 MWactiveMcculloch, Texas
Biggs BESS28INR0110Other200.0 MWoperationalMcCulloch, Texas
Heart of Texas Wind Project61032_HTXWind180.0 MWoperationalMcCulloch, Texas
RTS 2 Wind18INR0016Wind179.9 MWoperationalMcculloch, Texas
Rattlesnake Power, LLC60743_WT1Wind160.0 MWoperationalMcCulloch, Texas
Pecan Ridge27INR0593Other150.8 MWoperationalMcCulloch, Texas
Callan Solar67561_RIC93Solar90.0 MWactiveMcCulloch, Texas

Top developers

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); ERCOT — Generation Interconnection Status (GIS) report; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in McCulloch County.

Start tracking with interXdata