Tyler County, Texas — Interconnection Projects

The interXdata warehouse tracks 5 interconnection projects in Tyler, Texas, representing 540 MW of requested capacity.

5Total projects
0Active
0Operational
4Withdrawn
540 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Solar3390 MW
Battery1100 MW
Other150 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
DOUCETTEJ3610Solar150.0 MWwithdrawnTyler, Texas
DOUCETTE to DEER 138 kVJ2114Solar140.0 MWwithdrawnTyler, Texas
Warren 138kVJ2243Solar100.0 MWwithdrawnTyler, Texas
Fork Creek SubstationJ2253Battery100.0 MWwithdrawnTyler, Texas
Woodville Renewable Power Project58944_G1Other49.9 MWsuspendedTyler, Texas

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Tyler County.

Start tracking with interXdata