Tyler County, Texas — Interconnection Projects
The interXdata warehouse tracks 5 interconnection projects in Tyler, Texas, representing 540 MW of requested capacity.
5Total projects
0Active
0Operational
4Withdrawn
540 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 3 | 390 MW |
| Battery | 1 | 100 MW |
| Other | 1 | 50 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| DOUCETTE | J3610 | Solar | 150.0 MW | withdrawn | Tyler, Texas |
| DOUCETTE to DEER 138 kV | J2114 | Solar | 140.0 MW | withdrawn | Tyler, Texas |
| Warren 138kV | J2243 | Solar | 100.0 MW | withdrawn | Tyler, Texas |
| Fork Creek Substation | J2253 | Battery | 100.0 MW | withdrawn | Tyler, Texas |
| Woodville Renewable Power Project | 58944_G1 | Other | 49.9 MW | suspended | Tyler, Texas |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27