Fork Creek Substation (J2253)

Fork Creek Substation is a 100.0 MW battery interconnection project in Tyler, Texas with a current status of withdrawn. It is proposed to connect at Fork Creek Substation.

100.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameFork Creek Substation
Queue IDJ2253
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity100.0 MW
StateTexas
CountyTyler
Point of interconnectionFork Creek Substation
Requested (queue) date2021-08-17
Proposed in-service date2022-12-02
Operational date2022-12-02
Withdrawn date2025-03-07
Developer
Utility / transmission ownerEAST TEXAS ELECTRIC COOPERATIVE, INC.

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata