Albemarle County, Virginia — Interconnection Projects

The interXdata warehouse tracks 12 interconnection projects in Albemarle, Virginia, representing 387 MW of requested capacity.

12Total projects
1Active
1Operational
10Withdrawn
387 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Solar11387 MW
Battery10 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Kidds Store-Sherwood 115 kVAE2-092Solar138.0 MWactiveAlbemarle, Virginia
PJM Queue Project AF1-323 — Solar in Albemarle, VirginiaAF1-323Solar55.0 MWwithdrawnAlbemarle, Virginia
Scottsville-Colleen 138 kVAF1-323 - moved to TC1Solar55.0 MWwithdrawnAlbemarle, Virginia
Mount Eagle 34.5 kVAI1-125Solar22.0 MWwithdrawnAlbemarle, Virginia
Scottsville-Colleen 138 kVAG1-022 - moved to TC1Solar20.0 MWwithdrawnAlbemarle, Virginia
Scottsville-Colleen 138 kVAF2-302 - moved to TC1Solar20.0 MWwithdrawnAlbemarle, Virginia
PJM Queue Project AF2-302 — Solar in Albemarle, VirginiaAF2-302Solar20.0 MWwithdrawnAlbemarle, Virginia
PJM Queue Project AG1-022 — Solar in Albemarle, VirginiaAG1-022Solar20.0 MWwithdrawnAlbemarle, Virginia
Rivanna Solar67846_RIVASolar13.3 MWoperationalAlbemarle, Virginia
Mount Eagle 34.5kVAC1-116Solar12.5 MWwithdrawnAlbemarle, Virginia
Mount Eagle 34.5 kVAD1-040Solar11.0 MWwithdrawnAlbemarle, Virginia
Kidds Store-Sherwood 115 kVAH2-092Battery0.0 MWwithdrawnAlbemarle, Virginia

Top developers

Developer (canonical)ProjectsCapacity
Vista Energy Facility, LLC395 MW

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Albemarle County.

Start tracking with interXdata