Kidds Store-Sherwood 115 kV (AE2-092)

Kidds Store-Sherwood 115 kV is a 138.0 MW solar interconnection project in Albemarle, Virginia with a current status of active.

138.0 MWCapacity
ActiveStatus
—Market
SolarTechnology

Project facts

Canonical nameKidds Store-Sherwood 115 kV
Queue IDAE2-092
Statusactive
Source statusEngineering and Procurement
Market—
TechnologySolar
Capacity138.0 MW
StateVirginia
CountyAlbemarle
Point of interconnection—
Requested (queue) date2019-02-26
Proposed in-service date2027-06-30
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerDominion

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-10-22proposed_online_date2028-10-012027-06-30medium
2026-10-08proposed_online_date2027-06-302028-10-01medium
2026-07-29new_project—activehigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata