Tazewell County, Virginia — Interconnection Projects

The interXdata warehouse tracks 10 interconnection projects in Tazewell, Virginia, representing 1,047 MW of requested capacity.

10Total projects
4Active
0Operational
6Withdrawn
1,047 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Wind4630 MW
Solar4257 MW
Battery2160 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Tazewell-Saltville 138kVU2-071Wind200.0 MWwithdrawnTazewell, Virginia
Tazewell-Baileysville 138kVU2-017Wind200.0 MWwithdrawnTazewell, Virginia
Tazewell 138kVS54Wind130.0 MWwithdrawnTazewell, Virginia
Buckhorn-Lonesome Pine 138kVAC2-098Solar100.0 MWwithdrawnTazewell, Virginia
Lonesome Pine 138kVU2-050Wind100.0 MWwithdrawnTazewell, Virginia
Buckhorn 138 kVAH1-461 - moved to TC2Battery80.0 MWactiveTazewell, Virginia
PJM Queue Project AH1-461 — Battery in Tazewell, VirginiaAH1-461Battery80.0 MWactiveTazewell, Virginia
Saltville - Tazewell 138 kVAH1-133 - moved to TC2Solar70.0 MWactiveTazewell, Virginia
PJM Queue Project AH1-133 — Solar in Tazewell, VirginiaAH1-133Solar70.0 MWactiveTazewell, Virginia
Buckhorn 34.5 kVAH1-173Solar16.6 MWwithdrawnTazewell, Virginia

Top developers

Developer (canonical)ProjectsCapacity
Lakeside Energy, LLC180 MW
Hermes Solar LLC170 MW

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.